Make the day definition explicitDay rate to hourly: divide by the hours your day covers
Hourly equivalent = day rate ÷ covered hours. A USD 600 day is USD 80 per hour over 7.5 hours, or USD 75 over eight hours. The daily price stays the same; changing the hours changes the comparison. Enter your own agreed hours above rather than assuming that every service day is eight hours.
Original reference and examples checked November 9, 2026. All prices below are fictional, before-tax arithmetic examples, not recommended or surveyed market rates. Use Copy result or Download result above to save your custom inputs and result without signup.
From a day rate to a comparison week
Enter USD 750, 7.5 covered hours and four comparison days. The hourly equivalent is USD 100; the week scenario is USD 3,000 and 30 hours. Four days describes this scenario, not a required working week or a forecast of booked work.
From an hourly rate back to a day rate
Multiply hourly rate × covered hours: USD 80 × 7.5 = USD 600 per day. To check that result in the calculator, enter 600 as the day rate and 7.5 as the hours. This reverse example is a comparison; a day booking may include different scope or minimum terms from hourly work.
Use the approved billing basisThree USD 500 days: why the invoice is USD 1,500
Suppose a fictional approved assignment covers three full days at USD 500 per seven-hour day. The rounded hourly equivalent is USD 71.43. It helps compare rates, but multiplying it back across the assignment introduces three cents:
- Approved day-based subtotal
- 3 days × USD 500 = USD 1,500.00
- Hours for comparison
- 3 × 7 = 21 hours
- Rounded hourly reconstruction
- 21 × USD 71.43 = USD 1,500.03
- Reconstructed minus agreed subtotal
- +USD 0.03
- Suggested line description
- Consulting, Nov 16–18, 2026 · 3 approved days @ USD 500/day
- Manual line amount before tax
- USD 1,500.00
For this approved full-day example, retain the day-based subtotal. A half day, overtime or an extra hour needs its own agreed treatment. The calculator does not establish permission to charge it. Review tax separately.
Carry the checked day amount into InvoiceAgent
InvoiceAgent’s manual invoice lines accept a description and an amount. Calculate the approved day count × day rate, enter that line amount, and put the dates, day count and day price in the description so the recipient can check the basis. Review the final PDF and recipient before scheduling.
Connected Toggl and WakaTime imports use tracked hours and an entered hourly rate. That path does not infer approved billable days, minimum bookings or partial-day terms. If the agreement bills by day, prepare the checked day-based line separately and avoid also billing the same work through an hourly import. This free tool and its CSV do not create or update an invoice.