Template library

Non-Billable Time Exclusion Log

Download an editable log to separate non-billable entries from approved client hours, retain exclusion reasons, and reconcile the invoice subtotal.

Free text file with blank fields and a filled example. No signup required.

InvoiceAgent includes a 7-day free trial. No credit card required.

Illustrative example

Twelve logged hours, ten approved hours

Raw project duration
720 minutes / 12 hours
Approved client work
600 minutes / 10 hours
Excluded internal work
90 minutes
Unresolved scope
30 minutes / held
Reviewed subtotal
10 × USD 90 = USD 900

Fictional exact-hour example with no rounding, tax or FX. The unresolved 30 minutes are not treated as approved.

See the recorded product workflow

Quick context

Section

Invoice templates, reminder templates, and billing trackers that lead naturally into a scheduled workflow.

Best for

Freelancers reviewing tracked project time that contains internal or otherwise excluded work.

Outcome

Use this page to move from general research into a calmer, more repeatable invoicing process.

Action plan

How to complete the template

Save the source snapshot

Record project, account, period, timezone, export version and raw entry IDs. Keep report rounding separate from the original duration.

Assign one decision to each entry

Name the agreement clause or approval supporting each inclusion or exclusion. Put unresolved entries into a separate hold category and assign a reviewer.

Reconcile minutes before pricing

Check raw minutes = approved + excluded + unresolved. Apply the agreed rate only to eligible time, then inspect the saved invoice and refresh setting.

Editable resource

Preview the blank template

Replace the bracketed fields with your client’s details. The download also includes the filled example shown on this page.

TIME EXCLUSION LOG
Client / project / reviewer: [details]
Source account / report version / period / timezone: [details]
Agreement / rate / currency / rounding policy: [references]
Entry ID | raw minutes | approved/excluded/unresolved | reason | evidence | decision owner
[one row per entry]
Raw minutes: [total]
Approved / excluded / unresolved minutes: [totals]
Reconciliation difference: [raw minus all categories; must be zero]
Reviewed billed hours / subtotal: [amounts]
Invoice ID / fixed or refreshed amount / checked date: [details]
Unresolved entry / next review owner / date: [details]

Sources and further reading

Common pitfalls

Where teams usually lose momentum.

Avoid this

Deleting time to make a total match

Retain the costing record and document the billing decision. Source deletion can remove the evidence needed to explain an exclusion.

Avoid this

Trusting a billable flag as a complete agreement

A label helps review but does not resolve scope, caps or prior billing. Check those separately before invoicing.

Related topics

time trackingbillable scopetemplates

Find more templates and practical tools in the resources below.

FAQ

Questions people usually have before changing the workflow.

Does this change my time tracker?

No. It is an editable review record. Any source correction must be made and verified separately.

Can unresolved time be billed later?

If subsequently approved under the agreement, preserve the decision and map the entries to the later invoice. Do not include them in two periods.

Should I round each excluded entry?

Preserve raw duration first. Apply the agreed rounding policy consistently after classification, rather than using different rules to manufacture a target total.